Hairline cracks radiate from moulded-in brass inserts in a connector housing, sometimes only after the part has cooled on the bench.
What the failure looks like on the line
Injection moulded electronics enclosures rarely fail at the press; they fail at assembly, after a fit check, or when a new batch arrives with a different shrinkage.
A fine radial crack appears around a brass threaded insert hours after moulding, or when a terminal screw is tightened. The insert itself is seated correctly and concentric.
The metal insert and the polymer have very different thermal expansion coefficients, so as the part cools the shrinking resin grips the insert and builds hoop stress in the surrounding boss. A cold insert, a sharp knurl, or too little surrounding wall concentrates that stress, and a low-ductility or wet resin cannot relax it. Delayed cracking appears as the residual stress redistributes after ejection.
Buyers and suppliers usually agree on the drawing and disagree on the conditions under which the drawing was checked. On a buyer's specification this distinction matters: a part can measure inside tolerance and still fail in use, because the drawing records geometry while the complaint records behaviour. Insert preheat temperature is usually the first value both sides compare, and it is also the one most often quoted without the conditions attached to it.
The process window that decides it
Four variables move this result more than the rest. The ranges below are illustrative engineering guidance for a first discussion; confirm them on your own tool, material grade and part geometry before they become contract terms.
| Variable | Typical window | What fails outside it |
|---|---|---|
| Insert preheat temperature | 80-120 C | A cold insert chills the melt and raises local hoop stress |
| Boss wall around insert | 0.6-0.9 x insert diameter | Too thin a wall cannot carry the shrink stress |
| Mould temperature | 70-100 C | A cold tool freezes stress before the resin can relax |
| Resin moisture content | < 0.2 % by mass | Hydrolysis lowers ductility around the insert |
Table 1. Starting window for a joint process trial. Values are engineering guidance, not a measured survey.
Insert preheat temperature is typically held at 80-120 C. A cold insert chills the melt and raises local hoop stress Record it together with the measurement point and the moment in the cycle; a single number without a location is not a process setting.
Boss wall around insert is typically held at 0.6-0.9 x insert diameter. Too thin a wall cannot carry the shrink stress When this drifts, the symptom usually appears at one cavity, one sheet position or one lane before it appears across the whole batch.
Mould temperature is typically held at 70-100 C. A cold tool freezes stress before the resin can relax A change here is cheap during a trial and expensive after tooling release, so treat it as a controlled variable with a documented re-approval.
Resin moisture content is typically held at < 0.2 % by mass. Hydrolysis lowers ductility around the insert Put it on the change-control list, otherwise an unannounced material or setting substitution will be mistaken for ordinary process noise.
Reading the response curve

The left panel shows crack-free bosses (%) as insert preheat temperature (c) increases: the response rises from 24 to 95 on the illustrative 0–100 scale. The dashed line at 60 marks a proposed acceptance limit, not a universal standard. Move that line only after the test method and the sample plan have been agreed, otherwise two suppliers can both be compliant and still deliver different parts.
Read the shape rather than a single point. A curve that changes quickly near the limit is more sensitive to ordinary process noise than one that approaches it gradually, and that difference should be reflected in how tightly the setting is controlled and how often it is checked.
Where the causes actually sit
The right panel of Figure 1 splits audited failures of this type into five groups. The percentages are illustrative engineering guidance for prioritising an investigation, not a measured survey and not a prediction for your line.
| Cause | Illustrative share | First check |
|---|---|---|
| Cold insert chilling the melt | 34% | Inspect the boss around the insert under magnification for radial cracks. |
| Thin boss wall around insert | 24% | Measure the wall thickness around the insert against the drawing. |
| Sharp insert knurl | 18% | Confirm insert preheat temperature and dwell before each shot. |
| Low resin ductility | 14% | Check the insert knurl profile for a sharp, stress-raising edge. |
| Residual stress redistribution | 10% | Re-inspect a sample after 24 h to catch delayed cracking. |
Table 2. Cause split and the corresponding first check. Shares are indicative and sum to 100.
Cold insert chilling the melt accounts for roughly 34% of the illustrative split. Inspect the boss around the insert under magnification for radial cracks. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Thin boss wall around insert accounts for roughly 24% of the illustrative split. Measure the wall thickness around the insert against the drawing. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Sharp insert knurl accounts for roughly 18% of the illustrative split. Confirm insert preheat temperature and dwell before each shot. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Checks before sign-off
Run the same sequence on a retained good sample and on the disputed batch so the comparison means something.
- Inspect the boss around the insert under magnification for radial cracks.
- Measure the wall thickness around the insert against the drawing.
- Confirm insert preheat temperature and dwell before each shot.
- Check the insert knurl profile for a sharp, stress-raising edge.
- Re-inspect a sample after 24 h to catch delayed cracking.
Keep a retained reference sample beside every result. When a batch is disputed, the comparison that settles it is almost always between the retained part and the current one under the same method, not between either part and a number on a drawing. Record the instrument, the operator, the conditioning time and the position on the part or sheet for each reading.
Writing it into the specification and the evidence pack
A defined sample of insert bosses shall be inspected both at first-off and after an agreed conditioning period; any radial crack around an insert is rejectable, and terminal tightening torque shall be set below the level that first initiates cracking on a signed limit sample.
Write the requirement as a behaviour at a stated condition, not as a brand of material or a machine setting. State the test method, the conditioning, the sample plan and the rule for deciding a pass. Where a document is needed, ask the supplier for documentation that covers the actual construction and check its scope against your own market before approval; a document for the base material alone does not describe the finished part you are buying.
At first-article approval, freeze the drawing revision, the material and colour identification, the process window, the tool and cavity identification, and the inspection method. Any later change to grade, site, tool, or window should trigger a new first article rather than a paper waiver. Keep retained samples from the approved lot and from each production lot so that a future comparison is possible.
| Evidence item | What it must show |
|---|---|
| Approved drawing and revision | The exact geometry and tolerances the decision applies to |
| Material and colour identification | Grade, supplier, colour reference and any declared recycled content |
| Process window and change log | The agreed settings and any deviation since approval |
| Inspection record and retained samples | Method, conditions, results and a physical reference from the same lot |
Table 3. Minimum evidence pack for a first-article decision and a later batch dispute.
All ranges in this article are illustrative engineering guidance rather than measured data. Treat them as a starting agenda for a process trial, not as a certificate for a batch that has not been run.
Questions buyers ask
Is this a material problem or a process problem?
The metal insert and the polymer have very different thermal expansion coefficients, so as the part cools the shrinking resin grips the insert and builds hoop stress in the surrounding boss. A cold insert, a sharp knurl, or too little surrounding wall concentrates that stress, and a low-ductility or wet resin cannot relax it. Delayed cracking appears as the residual stress redistributes after ejection. It is worth separating the two before a supplier changes a grade: hold the material constant for one controlled run, then move one setting at a time. If the symptom follows the setting, the material was never the cause.
Can insert preheat temperature be traded against cycle time?
Only within the window stated in Table 1, and only with a recorded trial. A cold insert chills the melt and raises local hoop stress A faster cycle that sits outside the window usually moves the failure downstream, where it costs more to find.
What should be recorded at incoming inspection?
Keep the measurement, the method, the sample identity and the conditions together. Inspect the boss around the insert under magnification for radial cracks. A result without its conditions cannot be compared with a later batch.
Does a change of electronics enclosure require re-approval?
Treat any change to material grade, tool, site or process window as a change that needs a new first-article decision. For injection moulding work the drawing alone is not enough; the process route is part of what was approved.
How many samples are enough for a first-article decision?
There is no universal number. Sample across cavities, lanes, sheet positions or reel lengths so that the spread is visible, not just the average. Agree the sample plan and the acceptance rule with the supplier before the trial starts.
What belongs in the evidence pack?
The approved drawing and revision, the material and colour identification, the process window, the inspection method and results, the retained reference samples, and documentation covering the actual construction. Ask the supplier to state the scope of each document and check it against your own market.
Seeing this on a current injection moulding job?
Send the drawing, the material and grade, the process window you are running, and the point in the cycle or the shelf life where the fault appears. We will help you separate a material question from a process question and a specification question before anyone changes a tool.
Continue reading
- Cracked Brass Inserts in Insert Moulding: Preheat and Hoop Stress
- Insert Moulding Design: Holding Metal in Plastic Without Cracking
- Insert-Moulded Terminals: Core Shift and the Missing Datum
- Overmolding and Insert Molding: The Complete Design Guide
- Stripped Screw Bosses: Specify the Strip Torque, Not Just the Hole