A tube that leaves the die round but measures oval downstream is being deformed after the die, between the sizing and the haul-off.
What the failure looks like on the line
Extruded silicone tube is sold by bore, wall and length, yet most complaints concern ovality and curl after the reel is unwound.
A die-side ring is round, yet finished tube measures out-of-round with the flat side aligned to the haul-off direction.
At the die exit the extrudate is soft and still curing; it holds its shape only after cooling and vulcanisation progress. Excessive nip pressure, a short water-bath residence or high line speed lets the tube flatten before the network is strong enough to resist.
Most of these complaints arrive after the parts have been accepted, which is a sign that the acceptance test measured the wrong thing. On a buyer's specification this distinction matters: a part can measure inside tolerance and still fail in use, because the drawing records geometry while the complaint records behaviour. Haul-off nip pressure is usually the first value both sides compare, and it is also the one most often quoted without the conditions attached to it.
The process window that decides it
Four variables move this result more than the rest. The ranges below are illustrative engineering guidance for a first discussion; confirm them on your own tool, material grade and part geometry before they become contract terms.
| Variabel | Typical window | What fails outside it |
|---|---|---|
| Haul-off nip pressure | 0.5-2 bar | High nip pressure flattens the still-soft tube |
| Water-bath residence | 10-40 s | Short cooling leaves the wall too soft to hold roundness |
| Line speed | 2-12 m/min | High speed reduces setting time before the haul-off |
| Water temperature | 15-30 C | Warm water delays surface setting |
Table 1. Starting window for a joint process trial. Values are engineering guidance, not a measured survey.
Haul-off nip pressure is typically held at 0.5-2 bar. High nip pressure flattens the still-soft tube Record it together with the measurement point and the moment in the cycle; a single number without a location is not a process setting.
Water-bath residence is typically held at 10-40 s. Short cooling leaves the wall too soft to hold roundness When this drifts, the symptom usually appears at one cavity, one sheet position or one lane before it appears across the whole batch.
Line speed is typically held at 2-12 m/min. High speed reduces setting time before the haul-off A change here is cheap during a trial and expensive after tooling release, so treat it as a controlled variable with a documented re-approval.
Water temperature is typically held at 15-30 C. Warm water delays surface setting Put it on the change-control list, otherwise an unannounced material or setting substitution will be mistaken for ordinary process noise.
Reading the response curve

The left panel shows tube ovality (%) as relative haul-off tension increases: the response rises from 2 to 25 on the illustrative 0–100 scale. The dashed line at 8 marks a proposed acceptance limit, not a universal standard. Move that line only after the test method and the sample plan have been agreed, otherwise two suppliers can both be compliant and still deliver different parts.
Read the shape rather than a single point. A curve that changes quickly near the limit is more sensitive to ordinary process noise than one that approaches it gradually, and that difference should be reflected in how tightly the setting is controlled and how often it is checked.
Where the causes actually sit
The right panel of Figure 1 splits audited failures of this type into five groups. The percentages are illustrative engineering guidance for prioritising an investigation, not a measured survey and not a prediction for your line.
| Karena | Illustrative share | First check |
|---|---|---|
| Excessive haul-off nip pressure | 32% | Cut a die-side ring and a finished ring and compare roundness. |
| Short cooling residence | 26% | Mark the flat side and check its alignment with the haul-off nip. |
| Line speed too high | 18% | Reduce nip pressure and re-measure ovality on the next metre. |
| Warm cooling water | 14% | Extend cooling residence before changing die geometry. |
| Uneven die exit temperature | 10% | Log line speed against ovality at fixed intervals. |
Table 2. Cause split and the corresponding first check. Shares are indicative and sum to 100.
Excessive haul-off nip pressure accounts for roughly 32% of the illustrative split. Cut a die-side ring and a finished ring and compare roundness. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Short cooling residence accounts for roughly 26% of the illustrative split. Mark the flat side and check its alignment with the haul-off nip. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Line speed too high accounts for roughly 18% of the illustrative split. Reduce nip pressure and re-measure ovality on the next metre. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Checks before sign-off
The order matters because each step removes a class of explanation before the next one is opened.
- Cut a die-side ring and a finished ring and compare roundness.
- Mark the flat side and check its alignment with the haul-off nip.
- Reduce nip pressure and re-measure ovality on the next metre.
- Extend cooling residence before changing die geometry.
- Log line speed against ovality at fixed intervals.
Keep a retained reference sample beside every result. When a batch is disputed, the comparison that settles it is almost always between the retained part and the current one under the same method, not between either part and a number on a drawing. Record the instrument, the operator, the conditioning time and the position on the part or sheet for each reading.
Writing it into the specification and the evidence pack
Define an ovality limit measured on conditioned finished tube and require die-side and finished rings to be compared before die changes are accepted.
Write the requirement as a behaviour at a stated condition, not as a brand of material or a machine setting. State the test method, the conditioning, the sample plan and the rule for deciding a pass. Where a document is needed, ask the supplier for documentation that covers the actual construction and check its scope against your own market before approval; a document for the base material alone does not describe the finished part you are buying.
At first-article approval, freeze the drawing revision, the material and colour identification, the process window, the tool and cavity identification, and the inspection method. Any later change to grade, site, tool, or window should trigger a new first article rather than a paper waiver. Keep retained samples from the approved lot and from each production lot so that a future comparison is possible.
| Evidence item | What it must show |
|---|---|
| Approved drawing and revision | The exact geometry and tolerances the decision applies to |
| Material and colour identification | Grade, supplier, colour reference and any declared recycled content |
| Process window and change log | The agreed settings and any deviation since approval |
| Inspection record and retained samples | Method, conditions, results and a physical reference from the same lot |
Table 3. Minimum evidence pack for a first-article decision and a later batch dispute.
None of the figures above should be read as a measured survey. They are engineering guidance for framing a joint trial; confirm them on your own tool, grade and geometry before they become contract terms.
Questions buyers ask
Is this a material problem or a process problem?
At the die exit the extrudate is soft and still curing; it holds its shape only after cooling and vulcanisation progress. Excessive nip pressure, a short water-bath residence or high line speed lets the tube flatten before the network is strong enough to resist. It is worth separating the two before a supplier changes a grade: hold the material constant for one controlled run, then move one setting at a time. If the symptom follows the setting, the material was never the cause.
Can haul-off nip pressure be traded against cycle time?
Only within the window stated in Table 1, and only with a recorded trial. High nip pressure flattens the still-soft tube A faster cycle that sits outside the window usually moves the failure downstream, where it costs more to find.
What should be recorded at incoming inspection?
Keep the measurement, the method, the sample identity and the conditions together. Cut a die-side ring and a finished ring and compare roundness. A result without its conditions cannot be compared with a later batch.
Does a change of extruded tube require re-approval?
Treat any change to material grade, tool, site or process window as a change that needs a new first-article decision. For silicone rubber work the drawing alone is not enough; the process route is part of what was approved.
How many samples are enough for a first-article decision?
There is no universal number. Sample across cavities, lanes, sheet positions or reel lengths so that the spread is visible, not just the average. Agree the sample plan and the acceptance rule with the supplier before the trial starts.
What belongs in the evidence pack?
The approved drawing and revision, the material and colour identification, the process window, the inspection method and results, the retained reference samples, and documentation covering the actual construction. Ask the supplier to state the scope of each document and check it against your own market.
Seeing this on a current silicone rubber job?
Send the drawing, the material and grade, the process window you are running, and the point in the cycle or the shelf life where the fault appears. We will help you separate a material question from a process question and a specification question before anyone changes a tool.
Continue reading
- Silicone Tube Extrusion: Cold Feed, Hot Cure and Tight Tolerance
- Silicone Extrusion: Cold Feed, Hot Cure and the Tunnel Behind It
- Spliced Silicone Cord That Fails at the Joint: Tensile Strength, Cure and Acceptance
- Vacuum Sizing: Calibrating a Profile Without Pulling It Out of Shape
- Silicone Tube That Kinks on the Assembly Jig: Setting a Minimum Bend Radius