Pale stress-whitened pads appear where ejector pins push a storage bin out of the tool, especially on the first shots of a run.
What the failure looks like on the line
High-volume household parts are audited on cosmetics and fit across long runs, so a slow process drift is more expensive than a single bad shot.
Circular white marks sit over the ejector pins on the inner wall of a deep bin, sometimes with a slight raised lip. The worst marks appear early in the run before the tool is up to temperature.
If the part is still too hot or grips the core strongly, ejection force is high and the pin locally yields and crazes the surface, scattering light as a white pad. Insufficient draft, a polished core with high friction, or a poorly balanced ejector layout raises the force at individual pins. A cold start-up and short cooling time make the early shots the most vulnerable.
Buyers and suppliers usually agree on the drawing and disagree on the conditions under which the drawing was checked. On a buyer's specification this distinction matters: a part can measure inside tolerance and still fail in use, because the drawing records geometry while the complaint records behaviour. Draft angle on the core is usually the first value both sides compare, and it is also the one most often quoted without the conditions attached to it.
The process window that decides it
Four variables move this result more than the rest. The ranges below are illustrative engineering guidance for a first discussion; confirm them on your own tool, material grade and part geometry before they become contract terms.
| Değişken | Typical window | What fails outside it |
|---|---|---|
| Draft angle on the core | 1.0-2.0 deg | Low draft raises ejection force and strains the pin area |
| Soğutma süresi | 15-30 s | Too short ejects a soft part that yields under the pin |
| Ejection speed | 20-50 mm/s | A fast stroke loads the pin before the part releases |
| Mould temperature at start-up | within 5 C of set-point | A cold tool grips the part on the first shots |
Table 1. Starting window for a joint process trial. Values are engineering guidance, not a measured survey.
Draft angle on the core is typically held at 1.0-2.0 deg. Low draft raises ejection force and strains the pin area Record it together with the measurement point and the moment in the cycle; a single number without a location is not a process setting.
Soğutma süresi is typically held at 15-30 s. Too short ejects a soft part that yields under the pin When this drifts, the symptom usually appears at one cavity, one sheet position or one lane before it appears across the whole batch.
Ejection speed is typically held at 20-50 mm/s. A fast stroke loads the pin before the part releases A change here is cheap during a trial and expensive after tooling release, so treat it as a controlled variable with a documented re-approval.
Mould temperature at start-up is typically held at within 5 C of set-point. A cold tool grips the part on the first shots Put it on the change-control list, otherwise an unannounced material or setting substitution will be mistaken for ordinary process noise.
Reading the response curve

The left panel shows ejection force (relative index) as cooling time (s) increases: the response falls from 92 to 16 on the illustrative 0–100 scale. The dashed line at 60 marks a proposed acceptance limit, not a universal standard. Move that line only after the test method and the sample plan have been agreed, otherwise two suppliers can both be compliant and still deliver different parts.
Read the shape rather than a single point. A curve that changes quickly near the limit is more sensitive to ordinary process noise than one that approaches it gradually, and that difference should be reflected in how tightly the setting is controlled and how often it is checked.
Where the causes actually sit
The right panel of Figure 1 splits audited failures of this type into five groups. The percentages are illustrative engineering guidance for prioritising an investigation, not a measured survey and not a prediction for your line.
| Neden | Illustrative share | First check |
|---|---|---|
| Insufficient core draft | 34% | Measure draft on the core against the drawing and tool polish. |
| Short cooling time | 24% | Compare ejection force on the first shots against a warmed-up steady state. |
| Cold start-up tool | 18% | Inspect pin height and balance across the ejector plate. |
| Unbalanced ejector layout | 14% | Increase cooling time in steps and re-grade the pin area. |
| Fast ejection stroke | 10% | Grade the whitening under the same light as the agreed limit sample. |
Table 2. Cause split and the corresponding first check. Shares are indicative and sum to 100.
Insufficient core draft accounts for roughly 34% of the illustrative split. Measure draft on the core against the drawing and tool polish. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Short cooling time accounts for roughly 24% of the illustrative split. Compare ejection force on the first shots against a warmed-up steady state. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Cold start-up tool accounts for roughly 18% of the illustrative split. Inspect pin height and balance across the ejector plate. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Checks before sign-off
Run the same sequence on a retained good sample and on the disputed batch so the comparison means something.
- Measure draft on the core against the drawing and tool polish.
- Compare ejection force on the first shots against a warmed-up steady state.
- Inspect pin height and balance across the ejector plate.
- Increase cooling time in steps and re-grade the pin area.
- Grade the whitening under the same light as the agreed limit sample.
Keep a retained reference sample beside every result. When a batch is disputed, the comparison that settles it is almost always between the retained part and the current one under the same method, not between either part and a number on a drawing. Record the instrument, the operator, the conditioning time and the position on the part or sheet for each reading.
Writing it into the specification and the evidence pack
The ejector-contact area shall be graded against a signed cosmetic limit sample after the tool reaches its set-point temperature; whitening beyond the sample is rejectable, and ejection force shall be recorded at first-off and at steady state.
Write the requirement as a behaviour at a stated condition, not as a brand of material or a machine setting. State the test method, the conditioning, the sample plan and the rule for deciding a pass. Where a document is needed, ask the supplier for documentation that covers the actual construction and check its scope against your own market before approval; a document for the base material alone does not describe the finished part you are buying.
At first-article approval, freeze the drawing revision, the material and colour identification, the process window, the tool and cavity identification, and the inspection method. Any later change to grade, site, tool, or window should trigger a new first article rather than a paper waiver. Keep retained samples from the approved lot and from each production lot so that a future comparison is possible.
| Evidence item | What it must show |
|---|---|
| Approved drawing and revision | The exact geometry and tolerances the decision applies to |
| Material and colour identification | Grade, supplier, colour reference and any declared recycled content |
| Process window and change log | The agreed settings and any deviation since approval |
| Inspection record and retained samples | Method, conditions, results and a physical reference from the same lot |
Table 3. Minimum evidence pack for a first-article decision and a later batch dispute.
The values quoted here are illustrative engineering guidance, not a measured survey. Agree the test method, the sample size and the acceptance rule before comparing numbers across suppliers.
Questions buyers ask
Is this a material problem or a process problem?
If the part is still too hot or grips the core strongly, ejection force is high and the pin locally yields and crazes the surface, scattering light as a white pad. Insufficient draft, a polished core with high friction, or a poorly balanced ejector layout raises the force at individual pins. A cold start-up and short cooling time make the early shots the most vulnerable. It is worth separating the two before a supplier changes a grade: hold the material constant for one controlled run, then move one setting at a time. If the symptom follows the setting, the material was never the cause.
Can draft angle on the core be traded against cycle time?
Only within the window stated in Table 1, and only with a recorded trial. Low draft raises ejection force and strains the pin area A faster cycle that sits outside the window usually moves the failure downstream, where it costs more to find.
What should be recorded at incoming inspection?
Keep the measurement, the method, the sample identity and the conditions together. Measure draft on the core against the drawing and tool polish. A result without its conditions cannot be compared with a later batch.
Does a change of household require re-approval?
Treat any change to material grade, tool, site or process window as a change that needs a new first-article decision. For injection moulding work the drawing alone is not enough; the process route is part of what was approved.
How many samples are enough for a first-article decision?
There is no universal number. Sample across cavities, lanes, sheet positions or reel lengths so that the spread is visible, not just the average. Agree the sample plan and the acceptance rule with the supplier before the trial starts.
What belongs in the evidence pack?
The approved drawing and revision, the material and colour identification, the process window, the inspection method and results, the retained reference samples, and documentation covering the actual construction. Ask the supplier to state the scope of each document and check it against your own market.
Seeing this on a current injection moulding job?
Send the drawing, the material and grade, the process window you are running, and the point in the cycle or the shelf life where the fault appears. We will help you separate a material question from a process question and a specification question before anyone changes a tool.
Continue reading
- Ejector Pin Marks: Push Too Early, Push Too Small, Push Too Hard
- Ejection System Design: Pins, Sleeves, Strippers and the Marks They Leave
- Draft Angle in Injection Moulding: The Cheapest Feature in the Tool
- Sticking Parts: Read the Ejection Force Trace Before Re-Polishing
- Cooling Time in Injection Molding: The Calculation That Sets Cycle Time