The problem
Symptom. A first-article report covers only one cavity of a multi-cavity silicone tool, so a cavity that runs large is missed and a fit problem appears only in production.
What it costs. Sorting the affected cavities and re-running the first article costs an illustrative 10 h and a delay while the cavity balance is added to the report.
This article quantifies the cavity spread from a partial report, sets the cavity-balance requirement, and writes it into the first-article report.
When the first article covers one cavity
In one illustrative case a multi-cavity silicone tool is reported from one cavity only, so a cavity that runs 0.21 mm large is missed and a fit problem appears only after parts reach the line.
| FAI trigger | What it hides | First figure to check |
|---|---|---|
| One cavity only | Others unseen | Spread vs 0.10 mm |
| Cavity runs large | Fit fails later | Illustrative 10 h rerun |
| Sign-off rushed | Tool released blind | Cavity count of tool |
| Line problem | Stock delayed | Balance flagged |
Table 1 - Reading a single-cavity first article before series release
Need a fixed price for this seal?
Send the gland drawing, temperature range, media and annual volume. We will recommend a compound with test data and return samples with a written production quotation.
Get a silicone seal quotationEmail [email protected]WhatsApp
Quantify the cavity spread from a partial report
Quantify the spread before reporting it. Five cavities return illustrative cavity spreads of 0.06, 0.10, 0.15, 0.21 and 0.17 mm; the unbalanced cavity crosses the 0.10 mm release limit. These are illustrative worked values from stated assumptions, not a measured series or a quoted result.
A five-step diagnostic sequence
- Measure cavity 1.
Record the key dimension at cavity 1 to confirm the method. - Sweep the cavities.
Repeat the dimension on every cavity so the balance is known. - Flag the worst.
Mark any cavity whose spread exceeds the 0.10 mm release limit. - Adjust the tool.
Change the tooling so the worst cavity clears the limit, then re-measure. - File the report.
Attach one row per cavity so the customer sees the full balance.
The chart below is a typical result from that measurement step. Use it to separate a design limit from a setting that can still be recovered.

Set the cavity-balance reporting requirement
Set the requirement at a full cavity-balance report with the worst cavity flagged. With all cavities reported, the 0.21 mm cavity is caught and the tool adjusted; an illustrative 10 h of re-run is the cost of the partial report. These are illustrative worked values from stated assumptions, not a market survey, a quoted price or a measured series.
| Clause or parameter | Agreed value | What goes wrong outside it |
|---|---|---|
| Cavity coverage | All cavities reported | Worst cavity missed |
| Balance flag | Worst cavity marked | Fit fails in production |
| Release limit | 0.10 mm stated | Spread ignored |
| Report owner | Named per programme | Balance applied loosely |
Table 2 - Cavity-balance clauses for the first-article report
A controlled first-article measurement sequence
Run the measurement in a fixed order: measure cavity 1, confirm the method, sweep the cavities, then compare the balance. The table ranks the actions by fit risk so the balance is never skipped under schedule pressure.
| Control action | What it fixes | Cost or trade-off |
|---|---|---|
| Report all cavities | Full balance | Extra measure time |
| Flag worst cavity | Tool adjusted | One row per cavity |
| Reserve allowance | Covers worst | Scrap held |
| Re-map on tooling | No drift after change | One owner to maintain |
Table 3 - Cavity-balance controls ranked by fit risk
Write the cavity balance into the FAI report
Put the balance in the first-article report: one row per cavity, the key dimension, and the spread flagged. A written balance turns a single-cavity sign-off into a tool-wide release.
Want a compound check before you re-order?
Send us the gland drawing and the service conditions. We will compare the compound data against your temperature range and return a recommendation with sample parts.
What to send us
- Gland dimensions and cross-section
- Temperature range and media
- A failed seal if available
- Annual volume
Keep the balance current after tooling changes
Re-measure the balance after any tooling change, record the 10 h actually avoided, and re-forecast the cavity spread. A written report reviewed on dated evidence settles the balance question at first article rather than on the line.
Before you release this silicone seal
- The first-article report covers every cavity of the silicone tool
- The key dimension is recorded on each cavity for the balance
- The worst-cavity spread is flagged against the 0.10 mm limit
- The tool is adjusted when a cavity exceeds the release limit
- A named owner re-measures the balance after tooling changes
Most cold or heat failures are specification gaps, not bad batches. Fix the specification before changing suppliers.
Why report every cavity?
A multi-cavity tool can run one cavity large while the rest are fine. A single-cavity report hides the worst one, so a fit problem appears only in production.
How much does the partial report cost?
Using illustrative assumptions sorting the cavities and re-running first article costs 10 h and a delay. These are worked example values, not a measured series.
What limit applies?
A stated 0.10 mm cavity-spread release limit. In this illustrative case the worst cavity reads 0.21 mm, over the line.
Can we sample cavities?
Only if the customer agrees a reduced plan. The default requirement is the full cavity balance with the worst flagged.
Who owns the report?
A named owner re-measures the balance after tooling changes. Without one owner the spread is lost after a revision.
Does the report expire?
It is valid until the tooling changes. Re-measuring at each change keeps the cavity evidence current.
Get a seal specified for the real service conditions
Send us the gland drawing and the service conditions. We will recommend a compound with documented test data, review the squeeze, and supply samples with a production quotation.
To get an accurate quote, send:
- Gland drawing or seal cross-section
- Temperature range and media
- Pressure and movement
- Annual volume and target unit price
Request samples and a quotation
Prefer to talk it through first?
Email [email protected] or message us on WhatsApp +86 177 1752 9949. Send a drawing, a sample or a specification and an engineer will reply.
Why buyers work with Uplastech
ISO 9001, ISO 14001 and ISO 45001 certified. Founded in 2016, with injection moulding lines in Shanghai and an extrusion plant in Jiangsu. Moulding machines from 90T to 1100T and a maximum shot weight of 5100 g. Samples and a written quotation are available on request.
Continue reading
- Silicone compression set
- Silicone gasket and seal design
- Silicone hardness: Shore A
- Silicone industrial seals
- Silicone o-ring manufacturing
Ready to specify? See our silicone rubber moulding services o request a written quotation.