A joint that leaks on first assembly often has too little sealing contact pressure because the groove is underfilled, before any load relaxation occurs.
What the failure looks like on the line
Moulded gaskets are judged by sealing force over time, not by the hardness printed on the drawing.
A new gasket weeps at first pressurisation even though bolts are torqued to specification; the leak is uniform around the joint.
Initial contact pressure depends on how much of the gland volume the gasket fills and on how the compression is distributed across the flange. Underfill leaves the elastomer below the pressure needed to close surface asperities, so leakage appears immediately rather than after load loss in service.
Buyers and suppliers usually agree on the drawing and disagree on the conditions under which the drawing was checked. On a buyer's specification this distinction matters: a part can measure inside tolerance and still fail in use, because the drawing records geometry while the complaint records behaviour. Gland fill ratio is usually the first value both sides compare, and it is also the one most often quoted without the conditions attached to it.
The process window that decides it
Four variables move this result more than the rest. The ranges below are illustrative engineering guidance for a first discussion; confirm them on your own tool, material grade and part geometry before they become contract terms.
| Variable | Typical window | What fails outside it |
|---|---|---|
| Gland fill ratio | 75-90% | Below the window contact pressure is too low to seal |
| Compression of free height | 15-30% | Low compression gives poor asperity closure |
| Flange flatness | within 0.1 mm | Waviness opens local low-pressure paths |
| Bolt preload spread | within 10% | Uneven preload tilts the contact pressure map |
Table 1. Starting window for a joint process trial. Values are engineering guidance, not a measured survey.
Gland fill ratio is typically held at 75-90%. Below the window contact pressure is too low to seal Record it together with the measurement point and the moment in the cycle; a single number without a location is not a process setting.
Compression of free height is typically held at 15-30%. Low compression gives poor asperity closure When this drifts, the symptom usually appears at one cavity, one sheet position or one lane before it appears across the whole batch.
Flange flatness is typically held at within 0.1 mm. Waviness opens local low-pressure paths A change here is cheap during a trial and expensive after tooling release, so treat it as a controlled variable with a documented re-approval.
Bolt preload spread is typically held at within 10%. Uneven preload tilts the contact pressure map Put it on the change-control list, otherwise an unannounced material or setting substitution will be mistaken for ordinary process noise.
Reading the response curve

The left panel shows sealing contact pressure (relative, %) as gland fill ratio (%) increases: the response rises from 18 to 95 on the illustrative 0–100 scale. The dashed line at 60 marks a proposed acceptance limit, not a universal standard. Move that line only after the test method and the sample plan have been agreed, otherwise two suppliers can both be compliant and still deliver different parts.
Read the shape rather than a single point. A curve that changes quickly near the limit is more sensitive to ordinary process noise than one that approaches it gradually, and that difference should be reflected in how tightly the setting is controlled and how often it is checked.
Where the causes actually sit
The right panel of Figure 1 splits audited failures of this type into five groups. The percentages are illustrative engineering guidance for prioritising an investigation, not a measured survey and not a prediction for your line.
| Cause | Illustrative share | First check |
|---|---|---|
| Gland underfilled | 30% | Calculate gland fill from measured cross-section and groove volume. |
| Low compression set-point | 24% | Map contact pressure with a pressure-indicating film at assembly torque. |
| Flange waviness | 18% | Check flange flatness before blaming the gasket. |
| Uneven bolt preload | 16% | Confirm bolt preload spread across the joint. |
| Cross-section undersize | 12% | Compare leak onset pressure against the agreed reference joint. |
Table 2. Cause split and the corresponding first check. Shares are indicative and sum to 100.
Gland underfilled accounts for roughly 30% of the illustrative split. Calculate gland fill from measured cross-section and groove volume. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Low compression set-point accounts for roughly 24% of the illustrative split. Map contact pressure with a pressure-indicating film at assembly torque. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Flange waviness accounts for roughly 18% of the illustrative split. Check flange flatness before blaming the gasket. Start here before authorising a material or tooling change, because it is the fastest explanation to confirm or eliminate.
Checks before sign-off
Run the same sequence on a retained good sample and on the disputed batch so the comparison means something.
- Calculate gland fill from measured cross-section and groove volume.
- Map contact pressure with a pressure-indicating film at assembly torque.
- Check flange flatness before blaming the gasket.
- Confirm bolt preload spread across the joint.
- Compare leak onset pressure against the agreed reference joint.
Keep a retained reference sample beside every result. When a batch is disputed, the comparison that settles it is almost always between the retained part and the current one under the same method, not between either part and a number on a drawing. Record the instrument, the operator, the conditioning time and the position on the part or sheet for each reading.
Writing it into the specification and the evidence pack
Specify a gland fill range and a minimum initial contact pressure measured with pressure-indicating film at the stated assembly torque.
Write the requirement as a behaviour at a stated condition, not as a brand of material or a machine setting. State the test method, the conditioning, the sample plan and the rule for deciding a pass. Where a document is needed, ask the supplier for documentation that covers the actual construction and check its scope against your own market before approval; a document for the base material alone does not describe the finished part you are buying.
At first-article approval, freeze the drawing revision, the material and colour identification, the process window, the tool and cavity identification, and the inspection method. Any later change to grade, site, tool, or window should trigger a new first article rather than a paper waiver. Keep retained samples from the approved lot and from each production lot so that a future comparison is possible.
| Evidence item | What it must show |
|---|---|
| Approved drawing and revision | The exact geometry and tolerances the decision applies to |
| Material and colour identification | Grade, supplier, colour reference and any declared recycled content |
| Process window and change log | The agreed settings and any deviation since approval |
| Inspection record and retained samples | Method, conditions, results and a physical reference from the same lot |
Table 3. Minimum evidence pack for a first-article decision and a later batch dispute.
None of the figures above should be read as a measured survey. They are engineering guidance for framing a joint trial; confirm them on your own tool, grade and geometry before they become contract terms.
Questions buyers ask
Is this a material problem or a process problem?
Initial contact pressure depends on how much of the gland volume the gasket fills and on how the compression is distributed across the flange. Underfill leaves the elastomer below the pressure needed to close surface asperities, so leakage appears immediately rather than after load loss in service. It is worth separating the two before a supplier changes a grade: hold the material constant for one controlled run, then move one setting at a time. If the symptom follows the setting, the material was never the cause.
Can gland fill ratio be traded against cycle time?
Only within the window stated in Table 1, and only with a recorded trial. Below the window contact pressure is too low to seal A faster cycle that sits outside the window usually moves the failure downstream, where it costs more to find.
What should be recorded at incoming inspection?
Keep the measurement, the method, the sample identity and the conditions together. Calculate gland fill from measured cross-section and groove volume. A result without its conditions cannot be compared with a later batch.
Does a change of moulded gasket require re-approval?
Treat any change to material grade, tool, site or process window as a change that needs a new first-article decision. For silicone rubber work the drawing alone is not enough; the process route is part of what was approved.
How many samples are enough for a first-article decision?
There is no universal number. Sample across cavities, lanes, sheet positions or reel lengths so that the spread is visible, not just the average. Agree the sample plan and the acceptance rule with the supplier before the trial starts.
What belongs in the evidence pack?
The approved drawing and revision, the material and colour identification, the process window, the inspection method and results, the retained reference samples, and documentation covering the actual construction. Ask the supplier to state the scope of each document and check it against your own market.
Seeing this on a current silicone rubber job?
Send the drawing, the material and grade, the process window you are running, and the point in the cycle or the shelf life where the fault appears. We will help you separate a material question from a process question and a specification question before anyone changes a tool.
Continue reading
- Silicone Gaskets: Sealing Force, Creep and the Temperature Cycle
- Seal Cross-Section Measurement Method
- Silicone RFQ Gland Drawing: The Service-Data Fields a Buyer Must Fix Before Quotation
- When a Bigger O-Ring Extrudes: Gland Overfill in a Hydrostatic Test
- Silicone Gasket Leak Rate vs Flange Finish: Specifying Ra, Tool Lay and a Helium Test