{"id":9193,"date":"2024-01-10T01:00:00","date_gmt":"2024-01-10T01:00:00","guid":{"rendered":"https:\/\/uplastech.com\/rib-sink-telegraphing-after-paint\/"},"modified":"2026-11-08T08:11:14","modified_gmt":"2026-11-08T08:11:14","slug":"rib-sink-telegraphing-after-paint","status":"publish","type":"post","link":"https:\/\/uplastech.com\/tr\/rib-sink-telegraphing-after-paint\/","title":{"rendered":"Rib Sink Telegraphing Through Paint: Why a Flat Panel Shows Its Bones"},"content":{"rendered":"<style>\n.upl-blog{font-size:17px;line-height:1.78;color:#1f2937}\n.upl-blog p{margin:0 0 18px}\n.upl-blog h2{font-size:26px;line-height:1.3;color:#0b2b33;margin:46px 0 14px;font-weight:700;letter-spacing:-.015em}\n.upl-blog h3{font-size:19.5px;color:#0d3b47;margin:28px 0 10px;font-weight:700}\n.upl-blog ul,.upl-blog ol{margin:0 0 20px;padding-left:22px}\n.upl-blog li{margin:0 0 9px}\n.upl-blog figure{margin:0 0 34px}\n.upl-blog figure img{width:100%;height:auto;display:block;border-radius:10px}\n.upl-blog figcaption{font-size:13px;color:#6b7280;margin-top:10px;line-height:1.5}\n.upl-blog .toc{background:none;border:0;border-radius:0;padding:0;margin:0 0 34px}\n.upl-blog .toc .lwptoc{margin:0}\n.upl-blog .toc h4{margin:0 0 10px;font-size:13px;letter-spacing:.1em;text-transform:uppercase;color:#0d5563}\n.upl-blog .toc ol{margin:0;padding-left:18px;font-size:14.5px}\n.upl-blog .toc li{margin-bottom:6px}\n.upl-blog table{width:100%;border-collapse:collapse;font-size:14.5px;margin:0 0 10px}\n.upl-blog th{background:#0d3b47;color:#fff;text-align:left;padding:11px 13px;font-weight:600;font-size:13.5px;border:0}\n.upl-blog td{padding:11px 13px;border:0;border-bottom:1px solid #e8ebed;vertical-align:top}\n.upl-blog tbody tr:nth-child(even){background:#fafbfc}\n.upl-blog .tablecap{font-size:12.5px;color:#6b7280;margin:0 0 30px}\n.upl-blog .myth{background:#fff8ef;border:1px solid #f6ddbd;border-radius:8px;padding:16px 20px;margin:0 0 26px;font-size:15.5px}\n.upl-blog .myth b{color:#a85c10}\n.upl-blog .callout{background:#f2f8f9;border-radius:8px;padding:18px 22px;margin:0 0 26px;font-size:15.5px;border-left:3px solid #14707f}\n.upl-blog .faq h3{border-top:1px solid #eceff1;padding-top:22px;margin-top:0;font-size:18px}\n.upl-blog .faq h3:first-of-type{border-top:0;padding-top:0}\n.upl-blog .cta{background:linear-gradient(135deg,#0b2b33,#0d5563);color:#fff;border-radius:12px;padding:34px;margin:48px 0 30px}\n.upl-blog .cta h2,.upl-blog .cta .cta-h{color:#fff;margin:0 0 10px;font-size:24px;font-weight:700;line-height:1.3}\n.upl-blog .cta p{color:#c9dee3;margin:0 0 20px;font-size:16px}\n.upl-blog .btn{display:inline-block;background:#e07a1f;color:#fff;text-decoration:none;font-weight:700;padding:13px 26px;border-radius:8px;font-size:15.5px}\n.upl-blog .rel{border-top:1px solid #e8ebed;margin-top:40px;padding-top:26px}\n.upl-blog .rel h4{font-size:13px;letter-spacing:.1em;text-transform:uppercase;color:#6b7280;margin:0 0 14px}\n.upl-blog .rel ul{list-style:none;padding:0;margin:0}\n.upl-blog .rel li{padding:11px 0;border-bottom:1px dashed #e8ebed}\n.upl-blog .rel a{text-decoration:none;font-weight:600;font-size:15.5px}\n\/* ==UPL-CONVERSION-MODULES-START== 2024 problem-solving \/ lead-gen blocks *\/\n.upl-blog .mod-h{font-size:12.5px;letter-spacing:.12em;text-transform:uppercase;font-weight:700;color:#0d5563;margin:0 0 12px}\n.upl-blog .problem{background:#fff8f3;border:1px solid #f3ddc9;border-left:4px solid #e07a1f;border-radius:10px;padding:22px 26px;margin:0 0 32px;font-size:16px}\n.upl-blog .problem p{margin:0 0 10px}\n.upl-blog .problem p:last-child{margin-bottom:0}\n.upl-blog .problem .mod-h{color:#a85c10}\n.upl-blog .problem .problem-promise{font-weight:700;color:#0b2b33}\n.upl-blog .steps{background:#f7fafb;border:1px solid #e1ebee;border-radius:10px;padding:22px 26px;margin:0 0 28px}\n.upl-blog .steps ol{list-style:none;counter-reset:uplst;margin:0;padding:0}\n.upl-blog .steps li{counter-increment:uplst;position:relative;padding:0 0 16px 42px;margin:0;font-size:15.5px}\n.upl-blog .steps li:last-child{padding-bottom:0}\n.upl-blog .steps li::before{content:counter(uplst);position:absolute;left:0;top:2px;width:26px;height:26px;border-radius:50%;background:#0d5563;color:#fff;font-size:13px;font-weight:700;line-height:26px;text-align:center}\n.upl-blog table.spec th{background:#14707f}\n.upl-blog .conv{background:#eef6f7;border:1px solid #cfe4e8;border-radius:10px;padding:24px 26px;margin:32px 0}\n.upl-blog .conv p{margin:0 0 12px;font-size:15.5px}\n.upl-blog .conv .conv-lbl{font-weight:700;color:#0b2b33;margin:16px 0 8px}\n.upl-blog ul.conv-need{list-style:none;padding:0;margin:0 0 20px;display:grid;grid-template-columns:1fr 1fr;gap:6px 18px}\n.upl-blog ul.conv-need li{position:relative;padding-left:20px;margin:0;font-size:14.5px}\n.upl-blog ul.conv-need li::before{content:\"\";position:absolute;left:0;top:9px;width:9px;height:9px;border:2px solid #14707f;border-radius:2px}\n.upl-blog .conv-btn{display:inline-block;background:#0d5563;color:#fff;text-decoration:none;font-weight:700;padding:11px 22px;border-radius:7px;font-size:15px}\n.upl-blog .checklist{background:#fbfcfd;border:1px solid #e3e9ec;border-radius:10px;padding:24px 26px;margin:36px 0}\n.upl-blog .checklist ul{list-style:none;padding:0;margin:0 0 12px}\n.upl-blog .checklist li{position:relative;padding-left:28px;margin:0 0 10px;font-size:15.5px}\n.upl-blog .checklist li::before{content:\"\";position:absolute;left:0;top:7px;width:14px;height:14px;border:2px solid #0d5563;border-radius:3px}\n.upl-blog .cl-note{font-size:13.5px;color:#6b7280;margin:0}\n.upl-blog .cta .cta-lbl{color:#c9dee3;font-weight:700;margin:0 0 8px;font-size:14.5px}\n.upl-blog ul.cta-need{list-style:none;padding:0;margin:0 0 22px;display:grid;grid-template-columns:1fr 1fr;gap:4px 18px}\n.upl-blog ul.cta-need li{color:#e4f0f2;font-size:14.5px;padding-left:18px;position:relative;margin:0}\n.upl-blog ul.cta-need li::before{content:\"\\2713\";position:absolute;left:0;color:#e07a1f;font-weight:700}\n\/* ==UPL-CONVERSION-MODULES-END== *\/\n@media(max-width:640px){.upl-blog h2{font-size:22px}.upl-blog table{font-size:13px}.upl-blog .cta{padding:24px}.upl-blog ul.conv-need,.upl-blog ul.cta-need{grid-template-columns:1fr}.upl-blog .problem,.upl-blog .steps,.upl-blog .conv,.upl-blog .checklist{padding:18px}}\n\/* \u5355\u7bc7\u9875\u9690\u85cf WhatsApp \u95ee\u5019\u5361\uff0c\u53ea\u4fdd\u7559\u5706\u5f62\u6c14\u6ce1\uff0c\u907f\u514d\u906e\u6321\u4fa7\u680f\u8be2\u76d8\u63d0\u4ea4\u6309\u94ae\u3002\n   \u6ce8\u610f\uff1aClick to Chat \u7684\u70b9\u51fb\u903b\u8f91\u662f\u300c\u95ee\u5019\u5361\u5143\u7d20\u5b58\u5728\u5c31\u4e0d\u8df3\u8f6c\u300d\uff0c\u53ea\u9760 CSS \u9690\u85cf\u4f1a\u8ba9\u6c14\u6ce1\u53d8\u6210\u6b7b\u94fe\u63a5\u3002\n   Code Snippets #9\u300cUPL single post: WhatsApp bubble jumps straight to chat\u300d\u8d1f\u8d23\u628a\u8be5\u8282\u70b9\u4ece DOM \u79fb\u9664\uff0c\n   \u4e0b\u9762\u8fd9\u6761 CSS \u53ea\u662f\u79fb\u9664\u524d\u7684\u89c6\u89c9\u515c\u5e95\u3002\u5220 #9 \u524d\u5fc5\u987b\u5148\u5220\u8fd9\u6761\u89c4\u5219\u3002 *\/\nbody.single-post .ht_ctc_chat_greetings_box{display:none !important}\n<\/style>\n<div class=\"upl-blog\">\n<figure>\n<img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/uplastech.com\/wp-content\/uploads\/2026\/11\/2024-rib-sink-telegraphing-after-paint-hero.jpg\" alt=\"Real production view of an injection moulding machine and moulded parts\" width=\"1536\" height=\"909\"><figcaption>Real injection molding production context. Photo: Pexels.<\/figcaption><\/figure>\n<div class=\"problem\">\n<p class=\"mod-h\">The problem<\/p>\n<p><b>Symptom.<\/b> A panel that looks flat as moulded shows a clear shadow of every rib after the 120 C paint bake and high-gloss topcoat, so a passing first article becomes a rejected Class-A surface.<\/p>\n<p><b>What it costs.<\/b> The fault is found only after painting, the most expensive step, so whole batches are scrapped or reworked while moulder and painter argue over which inspection condition applies.<\/p>\n<p class=\"problem-promise\">This guide links the rib-to-wall ratio to measured sink depth before and after coating, and defines a painted-part acceptance limit to agree before tooling.<\/p>\n<\/div>\n<div class=\"toc\"><\/div>\n<h2 id=\"why-a-rib-shadow-appears-only-after-coating\">Why a rib shadow appears only after coating<\/h2>\n<p>A rib at 0.8 times the nominal wall leaves a 38 um sink that is invisible as moulded, yet a 120 C paint bake and high-gloss topcoat roughly double it to a legible shadow on the finished panel.<\/p>\n<table>\n<thead>\n<tr>\n<th>Observed symptom<\/th>\n<th>Most likely cause<\/th>\n<th>First check on the line<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Faint rib line only after painting<\/td>\n<td>Sink telegraphing through the coating<\/td>\n<td>Profile unpainted and painted panels from one shot<\/td>\n<\/tr>\n<tr>\n<td>Shadow matches every rib exactly<\/td>\n<td>Rib-to-wall ratio too high<\/td>\n<td>Measure rib and wall thickness on section<\/td>\n<\/tr>\n<tr>\n<td>Depth grows after the bake<\/td>\n<td>Stress release at 120 C<\/td>\n<td>Measure before and after the paint oven<\/td>\n<\/tr>\n<tr>\n<td>Only one rib reads through<\/td>\n<td>Local cooling or a long unsupported rib<\/td>\n<td>Log the rib position against the cooling layout<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"tablecap\">Table 1 - Reading the shadow before re-cutting the rib<\/p>\n<div class=\"callout\">Record which of these you are actually seeing before changing any setting. Two faults can look identical on the line and need opposite corrections.<\/div>\n<p><!-- upl-conv-v1 quickcta --><\/p>\n<div class=\"quickcta\">\n<p class=\"mod-h\">Need a fixed price for this moulded part?<\/p>\n<p>Send the 2D drawing, resin grade and annual volume. Our engineers return a DFM review, a material recommendation and a written quotation you can compare line by line.<\/p>\n<p class=\"quickcta-act\"><a class=\"quickcta-btn\" href=\"https:\/\/uplastech.com\/injection-molding\/\">Get a moulding quotation<\/a><a class=\"quickcta-alt\" href=\"mailto:john@uplastech.com\">Email john@uplastech.com<\/a><a class=\"quickcta-alt\" href=\"https:\/\/wa.me\/8617717529949\">WhatsApp<\/a><\/p>\n<\/div>\n<h2 id=\"measure-sink-on-unpainted-and-painted-panels\">Measure sink on unpainted and painted panels<\/h2>\n<p>Profile the sink across the rib with a profilometer on unpainted and painted panels from one shot. A jump from 12 to 26 um at a 0.6 ratio is telegraphing, not a new dent.<\/p>\n<div class=\"steps\">\n<p class=\"mod-h\">A five-step diagnostic sequence<\/p>\n<ol>\n<li><b>Profile the rib on unpainted and painted panels from one shot.<\/b><br \/>A doubling of depth after coating confirms telegraphing rather than handling damage.<\/li>\n<li><b>Section the part and measure rib against wall.<\/b><br \/>A ratio above 0.6 on a 2.5 mm wall is the design root cause.<\/li>\n<li><b>Record hold pressure, mould temperature and cooling.<\/b><br \/>A 45 MPa pack at 90 C leaves more root shrink than 60 MPa at 70 C.<\/li>\n<li><b>Compare against the 20 um legibility limit.<\/b><br \/>Define the gloss and viewing distance so a borderline panel is measurable.<\/li>\n<li><b>Thin the rib in the tool, then re-paint and re-measure.<\/b><br \/>Process tuning buys margin; only a thinner rib removes the cause.<\/li>\n<\/ol>\n<\/div>\n<p>The chart below is a typical result from that measurement step. Use it to separate a design limit from a setting that can still be recovered.<\/p>\n<figure>\n<img decoding=\"async\" src=\"https:\/\/uplastech.com\/wp-content\/uploads\/2026\/11\/rib-sink-telegraphing-after-paint-chart3.jpg\" alt=\"Rib Sink Telegraphing Through Paint: Why a Flat Panel Shows Its Bones: calculated response trend and an illustrative root-cause split\" width=\"1536\" height=\"909\"><figcaption>Figure 1 \u2014 Calculated response trend and an illustrative root-cause split. Values are engineering guidance for diagnosis, not a measured survey; confirm them on your own line before changing a drawing or a specification.<\/figcaption><\/figure>\n<h2 id=\"rib-to-wall-ratio-and-root-radius-for-the-drawing\">Rib-to-wall ratio and root radius for the drawing<\/h2>\n<p>Keep ribs at 0.5-0.6 times a 2.5 mm wall, so 1.3-1.5 mm, with a root radius under 0.25 mm, to hold sink below the 20 um legibility limit on the drawing.<\/p>\n<table class=\"spec\">\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Typical target<\/th>\n<th>What goes wrong outside it<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Rib to nominal wall ratio<\/td>\n<td>0.5-0.6<\/td>\n<td>At 0.8 the sink exceeds 38 um as moulded<\/td>\n<\/tr>\n<tr>\n<td>Root fillet radius<\/td>\n<td>At most 0.25 mm or 0.25 x wall<\/td>\n<td>A large radius adds mass at the rib root<\/td>\n<\/tr>\n<tr>\n<td>Sink depth after paint bake<\/td>\n<td>At most 20 um<\/td>\n<td>Above this it reads under a high-gloss topcoat<\/td>\n<\/tr>\n<tr>\n<td>Hold pressure<\/td>\n<td>50-65 MPa<\/td>\n<td>Low pack lets the rib root shrink away<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"tablecap\">Table 2 - Rib and sink parameters for the drawing<\/p>\n<h2 id=\"process-settings-that-move-the-margin\">Process settings that move the margin<\/h2>\n<p>Higher hold pressure near 60 MPa and a cooler 70 C mould reduce the as-moulded sink, but they cannot rescue a rib that is simply too thick for the wall.<\/p>\n<table>\n<thead>\n<tr>\n<th>Decision<\/th>\n<th>Effect on sink<\/th>\n<th>Trade-off<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Thin rib from 0.8 to 0.6 x wall<\/td>\n<td>38 um down to about 12 um as moulded<\/td>\n<td>Tool change; slightly less stiffness<\/td>\n<\/tr>\n<tr>\n<td>Raise hold pressure 45 to 60 MPa<\/td>\n<td>Reduces root shrink<\/td>\n<td>Risk of sticking and higher ejection force<\/td>\n<\/tr>\n<tr>\n<td>Lower mould temperature 90 to 70 C<\/td>\n<td>Skins over sooner<\/td>\n<td>Can raise residual stress and post-bake bow<\/td>\n<\/tr>\n<tr>\n<td>Accept only on painted first articles<\/td>\n<td>Tests the real condition<\/td>\n<td>Adds a paint step to sampling<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"tablecap\">Table 3 - Decisions that set painted-panel read-through<\/p>\n<div class=\"myth\"><b>Myth:<\/b> \"A process adjustment will fix it.\" Once a design limit is reached, more tuning only adds cost and variation. Confirm the limit with a measurement, then change the drawing or the specification.<\/div>\n<h2 id=\"define-acceptance-on-the-finished-part\">Define acceptance on the finished part<\/h2>\n<p>Agree acceptance on the finished part: a maximum sink depth measured after the full paint bake under a defined gloss and viewing distance, not on the raw moulding.<\/p>\n<div class=\"conv\">\n<p class=\"mod-h\">Not sure whether the fault is in the tool or the process?<\/p>\n<p>Send us the drawing, the process window and a few sample parts. We will tell you which change fixes the fault before you commit to a tool modification.<\/p>\n<p class=\"conv-lbl\">What to send us<\/p>\n<ul class=\"conv-need\">\n<li>Part drawing with the affected dimension<\/li>\n<li>Current process settings<\/li>\n<li>Sample parts from a good and a bad batch<\/li>\n<li>Annual volume<\/li>\n<\/ul>\n<p><a class=\"conv-btn\" href=\"\/injection-molding\/\">Send the part for review<\/a>\n<\/div>\n<h2 id=\"sampling-rules-that-catch-telegraphing-early\">Sampling rules that catch telegraphing early<\/h2>\n<p>Trim hold pressure and extend cooling first; thinning the rib in the steel is the permanent fix. Always re-measure painted panels, because unpainted readings understate the fault.<\/p>\n<div class=\"callout\">Validate one change at a time and keep the measurement record. A supplier discussion backed by data is resolved in days, not weeks.<\/div>\n<div class=\"checklist\">\n<p class=\"mod-h\">Before you release this injection moulding job<\/p>\n<ul>\n<li>Rib thickness is specified as a ratio of nominal wall on the drawing<\/li>\n<li>Root fillet radius is dimensioned, not left to the toolmaker<\/li>\n<li>Maximum sink depth is defined on the painted part after the production bake<\/li>\n<li>Gloss level and viewing distance for the visual check are agreed<\/li>\n<li>First-article approval includes painted panels from every cavity<\/li>\n<\/ul>\n<p class=\"cl-note\">Attach this list to the RFQ. Most moulding faults are decided at the drawing stage.<\/p>\n<\/div>\n<div class=\"faq\">\n<h3>Why is the sink invisible before painting?<\/h3>\n<p>A 10-20 um depression scatters little light on a moulded texture. A high-gloss topcoat levels optically and a 120 C bake releases stress, so the same depression reads as a rib shadow.<\/p>\n<h3>Is this the same as a normal sink mark?<\/h3>\n<p>The mechanism is the same local shrink at a thick rib root, but the dispute here is a part that passed raw inspection and failed after coating, so the acceptance condition must be the painted part.<\/p>\n<h3>What rib-to-wall ratio should we use?<\/h3>\n<p>0.5-0.6 of the nominal wall is a safe default; on a 2.5 mm wall that means a 1.3-1.5 mm rib with a root radius under 0.25 mm.<\/p>\n<h3>Can more hold pressure hide it?<\/h3>\n<p>Raising pack from 45 to 60 MPa reduces root shrink, but an oversized rib will still telegraph. Use pressure for margin, not as the fix.<\/p>\n<h3>Does a lower mould temperature help?<\/h3>\n<p>A cooler 70 C mould skins the surface sooner and can reduce the as-moulded sink, but it may add residual stress that reappears after the paint bake.<\/p>\n<h3>Who owns the rejected painted panels?<\/h3>\n<p>Define it up front. If the drawing only specifies raw-part flatness, the moulder passes and the painter inherits the claim; specify post-paint sink depth instead.<\/p>\n<\/div>\n<div class=\"cta\">\n<p class=\"cta-h\">Get a mouldable part and a fixed quotation<\/p>\n<p>Send us the part file and the failure history. Our engineers will return a DFM review, a material recommendation and a fixed quotation with a defined first-article acceptance test.<\/p>\n<p class=\"cta-lbl\">To get an accurate quote, send:<\/p>\n<ul class=\"cta-need\">\n<li>3D file or 2D part drawing<\/li>\n<li>Resin grade and any regrind limit<\/li>\n<li>Annual volume and target unit price<\/li>\n<li>The failed sample or defect photos<\/li>\n<\/ul>\n<p><a class=\"btn\" href=\"\/injection-molding\/\">Request a DFM review and quote<\/a><br \/>\n<!-- upl-conv-v1 contact --><\/p>\n<div class=\"contactbar\">\n<p class=\"contactbar-h\">Prefer to talk it through first?<\/p>\n<p>Email <a href=\"mailto:john@uplastech.com\">john@uplastech.com<\/a> or message us on <a href=\"https:\/\/wa.me\/8617717529949\">WhatsApp +86 177 1752 9949<\/a>. Send a drawing, a sample or a specification and an engineer will reply.<\/p>\n<\/div>\n<p><!-- upl-conv-v1 trust --><\/p>\n<div class=\"trust\">\n<p class=\"trust-h\">Why buyers work with Uplastech<\/p>\n<p>ISO 9001, ISO 14001 and ISO 45001 certified. Founded in 2016, with injection moulding lines in Shanghai and an extrusion plant in Jiangsu. Moulding machines from 90T to 1100T and a maximum shot weight of 5100 g. Samples and a written quotation are available on request.<\/p>\n<\/div>\n<\/div>\n<div class=\"rel\">\n<h4>Continue reading<\/h4>\n<ul>\n<li><a href=\"https:\/\/uplastech.com\/injection-molding-tolerances\/\">Injection molding tolerances: what to specify<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/snap-fit-design\/\">Snap-fit design: strain, deflection and retention<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/plastic-part-assembly-design\/\">Plastic part assembly design<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/dfm-review-checklist\/\">DFM review checklist<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/injection-molding-material-selection\/\">Injection molding material selection<\/a><\/li>\n<\/ul>\n<p><!-- upl-conv-v1 service --><\/p>\n<p class=\"rel-svc\">Ready to specify? See our <a href=\"https:\/\/uplastech.com\/injection-molding\/\">injection moulding services<\/a> or <a href=\"mailto:john@uplastech.com\">request a written quotation<\/a>.<\/p>\n<\/div>\n<\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Why is the sink invisible before painting?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A 10-20 um depression scatters little light on a moulded texture. A high-gloss topcoat levels optically and a 120 C bake releases stress, so the same depression reads as a rib shadow.\"}}, {\"@type\": \"Question\", \"name\": \"Is this the same as a normal sink mark?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The mechanism is the same local shrink at a thick rib root, but the dispute here is a part that passed raw inspection and failed after coating, so the acceptance condition must be the painted part.\"}}, {\"@type\": \"Question\", \"name\": \"What rib-to-wall ratio should we use?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"0.5-0.6 of the nominal wall is a safe default; on a 2.5 mm wall that means a 1.3-1.5 mm rib with a root radius under 0.25 mm.\"}}, {\"@type\": \"Question\", \"name\": \"Can more hold pressure hide it?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Raising pack from 45 to 60 MPa reduces root shrink, but an oversized rib will still telegraph. Use pressure for margin, not as the fix.\"}}, {\"@type\": \"Question\", \"name\": \"Does a lower mould temperature help?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A cooler 70 C mould skins the surface sooner and can reduce the as-moulded sink, but it may add residual stress that reappears after the paint bake.\"}}, {\"@type\": \"Question\", \"name\": \"Who owns the rejected painted panels?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Define it up front. If the drawing only specifies raw-part flatness, the moulder passes and the painter inherits the claim; specify post-paint sink depth instead.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This guide links the rib-to-wall ratio to measured sink depth before and after coating, and defines a painted-part acceptance limit to agree before tooling.<\/p>","protected":false},"author":1,"featured_media":9191,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-9193","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-injection-molding"],"meta_box":{"post-to-quiz_to":[]},"_links":{"self":[{"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/posts\/9193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/comments?post=9193"}],"version-history":[{"count":1,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/posts\/9193\/revisions"}],"predecessor-version":[{"id":9285,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/posts\/9193\/revisions\/9285"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/media\/9191"}],"wp:attachment":[{"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/media?parent=9193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/categories?post=9193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uplastech.com\/tr\/wp-json\/wp\/v2\/tags?post=9193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}