
The problem
Symptom. The first 5-15 parts after a stop or colour change show a dark blemish or a half-filled cavity at one gate, then the tool runs perfectly for the rest of the shift.
What it costs. Start-up scrap is repeated after every idle, colour change or break, and when the quantity and ownership are not defined it becomes a standing dispute that inflates the quoted unit price.
This guide ties the fault to tip-zone temperature and soak time, and gives the cold-slug well dimension and start-up scrap clause to specify before production.
What a cold slug actually is
After an idle period, melt at the gate tip cools into a 2-5 mm solid plug. The next shot drives that cold slug into the cavity, leaving a dark gate blemish or a blocked gate for the first 5-15 parts.
| Observed symptom | Most likely cause | First check on the line |
|---|---|---|
| Dark blemish at the gate, first 10 shots | Cold slug driven into the cavity | Log defect count against soak time |
| One cavity half-fills at start-up | Solid plug blocking the tip | Read the tip-zone thermocouple |
| Fault returns after every colour change | Idle temperature dropped too low | Check stand-by setpoint and purge volume |
| Fault follows one zone only | Failed heater or loose thermocouple | Clamp-meter each zone against the setpoint |
Table 1 - Reading a start-up gate fault
Need a fixed price for this moulded part?
Send the 2D drawing, resin grade and annual volume. Our engineers return a DFM review, a material recommendation and a written quotation you can compare line by line.
Confirm the fault is start-up, not continuous
Count gate defects against start-up soak time and log the tip thermocouple. A rate that falls to zero after 15-30 min is cold slug, not a resin or venting fault.
A five-step diagnostic sequence
- Count gate defects by shot number after a stop.
If the first 5-15 parts are bad and the rest are clean, it is a cold slug. - Read every tip and manifold thermocouple.
Confirm the tip is at 245 C, not 200 C, before the first shot. - Verify the soak and stand-by settings.
Enforce 15-30 min at setpoint and an idle drop of no more than 50 C. - Check heater zones with a clamp meter.
A dead heater or loose thermocouple shows up as one cold zone. - Add a cold-slug well if temperature cannot fix it.
Machine a well at least 1.5 x the gate diameter as the permanent remedy.
The chart below is a typical result from that measurement step. Use it to separate a design limit from a setting that can still be recovered.

Temperature zones and soak on the sheet
A tip zone held at 200 C while the manifold runs at 245 C always forms a plug. Set the tip to 245 C and allow a 20 min soak before the first shot on a 90T-1100T machine.
| Paramètres | Typical target | What goes wrong outside it |
|---|---|---|
| Nozzle tip temperature for ABS | 240-250 C | At 200 C a 2-5 mm plug forms at the gate |
| Start-up soak time | 15-30 min at setpoint | Short soaks leave the tip below melt temperature |
| Cold-slug well depth | At least 1.5 x gate diameter | Without a well the plug enters the part |
| Stand-by idle setpoint | Only 30-50 C below running | A deep idle drop guarantees a cold slug |
Table 2 - Hot runner parameters for the process sheet
Why a cold-slug well is the permanent fix
A cold-slug well of at least 1.5 times the gate diameter behind the tip traps the plug so it never reaches the part. On an open gate this well is often the cheapest permanent fix.
| Contrôle | Effect | Trade-off |
|---|---|---|
| Raise tip zone to 245 C | Keeps the gate molten through the idle | Slight risk of drool on open gates |
| Enforce a 20 min soak before sampling | Brings the whole tip to setpoint | 20 min of lost output after each stop |
| Add a cold-slug well | Traps the plug before the cavity | One-off tool modification |
| Log each heater zone at start-up | Catches a dead zone early | Needs a clamp-meter check each start |
Table 3 - Controls that remove start-up cold slugs
Write start-up scrap into the order
Write start-up scrap into the purchase agreement: a defined soak, a permitted number of start-up parts to scrap, and who owns them after a colour change or unplanned stop.
Not sure whether the fault is in the tool or the process?
Send us the drawing, the process window and a few sample parts. We will tell you which change fixes the fault before you commit to a tool modification.
What to send us
- Part drawing with the affected dimension
- Current process settings
- Sample parts from a good and a bad batch
- Annual volume
Recovery order at the press
On the line, purge at the setpoint, confirm each heater zone with a clamp meter, and only then sample. Re-cutting a cold-slug well is a tool change, so prove temperature and soak first.
Before you release this injection moulding job
- Nozzle tip, manifold and stand-by setpoints are named in the process sheet
- A defined start-up soak time and soak temperature are agreed
- Cold-slug well depth is dimensioned on the tool drawing
- Permitted start-up scrap quantity and ownership are in the purchase order
- Each heater and thermocouple zone is logged at tool handover and after a stop
Attach this list to the RFQ. Most moulding faults are decided at the drawing stage.
Is a cold slug the same as a short shot?
No. A short shot is a filling problem across the whole part; a cold slug is a solid plug at the gate that blemishes or partly blocks it on the first shots after a stop.
How long should the hot runner soak before the first shot?
Typically 15-30 min at the full setpoint. The manifold may be hot while the tip is still cold, so read the tip thermocouple, not just the controller.
Why does the fault return after a colour change?
During the purge and idle the tip cools. Keep the stand-by setpoint within 30-50 C of running and purge at temperature before sampling.
Can a valve gate avoid cold slugs?
A valve gate seals the orifice, but a cold plug can still form behind the pin and be injected on opening. Tip temperature and soak still matter.
Should the moulder or the customer pay for start-up scrap?
Agree it in the purchase order. Define a soak and a permitted number of start-up parts so the cost is not argued after every unplanned stop.
What if the tip is at setpoint but defects remain?
Check for a dead heater zone with a clamp meter, then add a cold-slug well of at least 1.5 x the gate diameter to trap the plug.
Get a mouldable part and a fixed quotation
Send us the part file and the failure history. Our engineers will return a DFM review, a material recommendation and a fixed quotation with a defined first-article acceptance test.
To get an accurate quote, send:
- 3D file or 2D part drawing
- Resin grade and any regrind limit
- Annual volume and target unit price
- The failed sample or defect photos
Request a DFM review and quote
Prefer to talk it through first?
Courriel [email protected] or message us on WhatsApp +86 177 1752 9949. Send a drawing, a sample or a specification and an engineer will reply.
Why buyers work with Uplastech
ISO 9001, ISO 14001 and ISO 45001 certified. Founded in 2016, with injection moulding lines in Shanghai and an extrusion plant in Jiangsu. Moulding machines from 90T to 1100T and a maximum shot weight of 5100 g. Samples and a written quotation are available on request.