{"id":9157,"date":"2024-01-06T01:00:00","date_gmt":"2024-01-06T01:00:00","guid":{"rendered":"https:\/\/uplastech.com\/o-ring-gland-overfill-extrusion-acceptance\/"},"modified":"2026-11-08T08:10:26","modified_gmt":"2026-11-08T08:10:26","slug":"o-ring-gland-overfill-extrusion-acceptance","status":"publish","type":"post","link":"https:\/\/uplastech.com\/de\/o-ring-gland-overfill-extrusion-acceptance\/","title":{"rendered":"When a Bigger O-Ring Extrudes: Gland Overfill in a Hydrostatic Test"},"content":{"rendered":"<style>\n.upl-blog{font-size:17px;line-height:1.78;color:#1f2937}\n.upl-blog p{margin:0 0 18px}\n.upl-blog h2{font-size:26px;line-height:1.3;color:#0b2b33;margin:46px 0 14px;font-weight:700;letter-spacing:-.015em}\n.upl-blog h3{font-size:19.5px;color:#0d3b47;margin:28px 0 10px;font-weight:700}\n.upl-blog ul,.upl-blog ol{margin:0 0 20px;padding-left:22px}\n.upl-blog li{margin:0 0 9px}\n.upl-blog figure{margin:0 0 34px}\n.upl-blog figure img{width:100%;height:auto;display:block;border-radius:10px}\n.upl-blog figcaption{font-size:13px;color:#6b7280;margin-top:10px;line-height:1.5}\n.upl-blog .toc{background:none;border:0;border-radius:0;padding:0;margin:0 0 34px}\n.upl-blog .toc .lwptoc{margin:0}\n.upl-blog .toc h4{margin:0 0 10px;font-size:13px;letter-spacing:.1em;text-transform:uppercase;color:#0d5563}\n.upl-blog .toc ol{margin:0;padding-left:18px;font-size:14.5px}\n.upl-blog .toc li{margin-bottom:6px}\n.upl-blog table{width:100%;border-collapse:collapse;font-size:14.5px;margin:0 0 10px}\n.upl-blog th{background:#0d3b47;color:#fff;text-align:left;padding:11px 13px;font-weight:600;font-size:13.5px;border:0}\n.upl-blog td{padding:11px 13px;border:0;border-bottom:1px solid #e8ebed;vertical-align:top}\n.upl-blog tbody tr:nth-child(even){background:#fafbfc}\n.upl-blog .tablecap{font-size:12.5px;color:#6b7280;margin:0 0 30px}\n.upl-blog .myth{background:#fff8ef;border:1px solid #f6ddbd;border-radius:8px;padding:16px 20px;margin:0 0 26px;font-size:15.5px}\n.upl-blog .myth b{color:#a85c10}\n.upl-blog .callout{background:#f2f8f9;border-radius:8px;padding:18px 22px;margin:0 0 26px;font-size:15.5px;border-left:3px solid #14707f}\n.upl-blog .faq h3{border-top:1px solid #eceff1;padding-top:22px;margin-top:0;font-size:18px}\n.upl-blog .faq h3:first-of-type{border-top:0;padding-top:0}\n.upl-blog .cta{background:linear-gradient(135deg,#0b2b33,#0d5563);color:#fff;border-radius:12px;padding:34px;margin:48px 0 30px}\n.upl-blog .cta h2,.upl-blog .cta .cta-h{color:#fff;margin:0 0 10px;font-size:24px;font-weight:700;line-height:1.3}\n.upl-blog .cta p{color:#c9dee3;margin:0 0 20px;font-size:16px}\n.upl-blog .btn{display:inline-block;background:#e07a1f;color:#fff;text-decoration:none;font-weight:700;padding:13px 26px;border-radius:8px;font-size:15.5px}\n.upl-blog .rel{border-top:1px solid #e8ebed;margin-top:40px;padding-top:26px}\n.upl-blog .rel h4{font-size:13px;letter-spacing:.1em;text-transform:uppercase;color:#6b7280;margin:0 0 14px}\n.upl-blog .rel ul{list-style:none;padding:0;margin:0}\n.upl-blog .rel li{padding:11px 0;border-bottom:1px dashed #e8ebed}\n.upl-blog .rel a{text-decoration:none;font-weight:600;font-size:15.5px}\n\/* ==UPL-CONVERSION-MODULES-START== 2024 problem-solving \/ lead-gen blocks *\/\n.upl-blog .mod-h{font-size:12.5px;letter-spacing:.12em;text-transform:uppercase;font-weight:700;color:#0d5563;margin:0 0 12px}\n.upl-blog .problem{background:#fff8f3;border:1px solid #f3ddc9;border-left:4px solid #e07a1f;border-radius:10px;padding:22px 26px;margin:0 0 32px;font-size:16px}\n.upl-blog .problem p{margin:0 0 10px}\n.upl-blog .problem p:last-child{margin-bottom:0}\n.upl-blog .problem .mod-h{color:#a85c10}\n.upl-blog .problem .problem-promise{font-weight:700;color:#0b2b33}\n.upl-blog .steps{background:#f7fafb;border:1px solid #e1ebee;border-radius:10px;padding:22px 26px;margin:0 0 28px}\n.upl-blog .steps ol{list-style:none;counter-reset:uplst;margin:0;padding:0}\n.upl-blog .steps li{counter-increment:uplst;position:relative;padding:0 0 16px 42px;margin:0;font-size:15.5px}\n.upl-blog .steps li:last-child{padding-bottom:0}\n.upl-blog .steps li::before{content:counter(uplst);position:absolute;left:0;top:2px;width:26px;height:26px;border-radius:50%;background:#0d5563;color:#fff;font-size:13px;font-weight:700;line-height:26px;text-align:center}\n.upl-blog table.spec th{background:#14707f}\n.upl-blog .conv{background:#eef6f7;border:1px solid #cfe4e8;border-radius:10px;padding:24px 26px;margin:32px 0}\n.upl-blog .conv p{margin:0 0 12px;font-size:15.5px}\n.upl-blog .conv .conv-lbl{font-weight:700;color:#0b2b33;margin:16px 0 8px}\n.upl-blog ul.conv-need{list-style:none;padding:0;margin:0 0 20px;display:grid;grid-template-columns:1fr 1fr;gap:6px 18px}\n.upl-blog ul.conv-need li{position:relative;padding-left:20px;margin:0;font-size:14.5px}\n.upl-blog ul.conv-need li::before{content:\"\";position:absolute;left:0;top:9px;width:9px;height:9px;border:2px solid #14707f;border-radius:2px}\n.upl-blog .conv-btn{display:inline-block;background:#0d5563;color:#fff;text-decoration:none;font-weight:700;padding:11px 22px;border-radius:7px;font-size:15px}\n.upl-blog .checklist{background:#fbfcfd;border:1px solid #e3e9ec;border-radius:10px;padding:24px 26px;margin:36px 0}\n.upl-blog .checklist ul{list-style:none;padding:0;margin:0 0 12px}\n.upl-blog .checklist li{position:relative;padding-left:28px;margin:0 0 10px;font-size:15.5px}\n.upl-blog .checklist li::before{content:\"\";position:absolute;left:0;top:7px;width:14px;height:14px;border:2px solid #0d5563;border-radius:3px}\n.upl-blog .cl-note{font-size:13.5px;color:#6b7280;margin:0}\n.upl-blog .cta .cta-lbl{color:#c9dee3;font-weight:700;margin:0 0 8px;font-size:14.5px}\n.upl-blog ul.cta-need{list-style:none;padding:0;margin:0 0 22px;display:grid;grid-template-columns:1fr 1fr;gap:4px 18px}\n.upl-blog ul.cta-need li{color:#e4f0f2;font-size:14.5px;padding-left:18px;position:relative;margin:0}\n.upl-blog ul.cta-need li::before{content:\"\\2713\";position:absolute;left:0;color:#e07a1f;font-weight:700}\n\/* ==UPL-CONVERSION-MODULES-END== *\/\n@media(max-width:640px){.upl-blog h2{font-size:22px}.upl-blog table{font-size:13px}.upl-blog .cta{padding:24px}.upl-blog ul.conv-need,.upl-blog ul.cta-need{grid-template-columns:1fr}.upl-blog .problem,.upl-blog .steps,.upl-blog .conv,.upl-blog .checklist{padding:18px}}\n\/* \u5355\u7bc7\u9875\u9690\u85cf WhatsApp \u95ee\u5019\u5361\uff0c\u53ea\u4fdd\u7559\u5706\u5f62\u6c14\u6ce1\uff0c\u907f\u514d\u906e\u6321\u4fa7\u680f\u8be2\u76d8\u63d0\u4ea4\u6309\u94ae\u3002\n   \u6ce8\u610f\uff1aClick to Chat \u7684\u70b9\u51fb\u903b\u8f91\u662f\u300c\u95ee\u5019\u5361\u5143\u7d20\u5b58\u5728\u5c31\u4e0d\u8df3\u8f6c\u300d\uff0c\u53ea\u9760 CSS \u9690\u85cf\u4f1a\u8ba9\u6c14\u6ce1\u53d8\u6210\u6b7b\u94fe\u63a5\u3002\n   Code Snippets #9\u300cUPL single post: WhatsApp bubble jumps straight to chat\u300d\u8d1f\u8d23\u628a\u8be5\u8282\u70b9\u4ece DOM \u79fb\u9664\uff0c\n   \u4e0b\u9762\u8fd9\u6761 CSS \u53ea\u662f\u79fb\u9664\u524d\u7684\u89c6\u89c9\u515c\u5e95\u3002\u5220 #9 \u524d\u5fc5\u987b\u5148\u5220\u8fd9\u6761\u89c4\u5219\u3002 *\/\nbody.single-post .ht_ctc_chat_greetings_box{display:none !important}\n<\/style>\n<div class=\"upl-blog\">\n<figure>\n<img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/uplastech.com\/wp-content\/uploads\/2026\/10\/silicone-rubber-parts.jpg\" alt=\"Real moulded silicone seals and O-rings made by Uplastech\" width=\"1536\" height=\"909\"><figcaption>Real silicone rubber production context. Uplastech product photo.<\/figcaption><\/figure>\n<div class=\"problem\">\n<p class=\"mod-h\">The problem<\/p>\n<p><b>Symptom.<\/b> After a weep complaint, a buyer approves a larger cross-section O-ring for the same groove, and the new seals extrude and nibble during the routine hydrostatic acceptance test.<\/p>\n<p><b>What it costs.<\/b> The substitution that was meant to guarantee a seal instead fails a witnessed pressure test at goods-in, so an entire assembly batch is held and the drawing is disputed.<\/p>\n<p class=\"problem-promise\">This guide calculates gland fill, links overfill to extrusion through the clearance gap, and gives a gland and acceptance-test clause to put on the drawing.<\/p>\n<\/div>\n<div class=\"toc\"><\/div>\n<h2 id=\"why-a-bigger-o-ring-can-seal-worse\">Why a bigger O-ring can seal worse<\/h2>\n<p>Gland fill is seal cross-sectional area divided by groove area. Above 90 % there is no room for thermal expansion or swell, so pressure drives rubber into the clearance gap; at 0.2 mm clearance and 100 bar the seal extrudes and nibbles.<\/p>\n<table>\n<thead>\n<tr>\n<th>Finding at the pressure test<\/th>\n<th>Most likely cause<\/th>\n<th>Confirming measurement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Chewed lip on low-pressure side<\/td>\n<td>Extrusion into the clearance gap<\/td>\n<td>Measure nibbling depth after the test<\/td>\n<\/tr>\n<tr>\n<td>Seal split along its circumference<\/td>\n<td>Gland fill above 100 %<\/td>\n<td>Recalculate fill from the drawing<\/td>\n<\/tr>\n<tr>\n<td>High assembly force, twisted seal<\/td>\n<td>Overfill, no room to seat<\/td>\n<td>Check installed squeeze and groove volume<\/td>\n<\/tr>\n<tr>\n<td>Leak only at peak pressure<\/td>\n<td>Gap too wide for the hardness<\/td>\n<td>Measure diametral clearance at 100 bar<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"tablecap\">Table 1 - Reading an extrusion failure after a hydrostatic test<\/p>\n<div class=\"callout\">Record which of these you are actually seeing before changing any setting. Two faults can look identical on the line and need opposite corrections.<\/div>\n<p><!-- upl-conv-v1 quickcta --><\/p>\n<div class=\"quickcta\">\n<p class=\"mod-h\">Need a fixed price for this seal?<\/p>\n<p>Send the gland drawing, temperature range, media and annual volume. We will recommend a compound with test data and return samples with a written production quotation.<\/p>\n<p class=\"quickcta-act\"><a class=\"quickcta-btn\" href=\"https:\/\/uplastech.com\/silicone-rubber\/\">Get a silicone seal quotation<\/a><a class=\"quickcta-alt\" href=\"mailto:john@uplastech.com\">Email john@uplastech.com<\/a><a class=\"quickcta-alt\" href=\"https:\/\/wa.me\/8617717529949\">WhatsApp<\/a><\/p>\n<\/div>\n<h2 id=\"calculate-gland-fill-before-changing-section\">Calculate gland fill before changing section<\/h2>\n<p>A hydrostatic acceptance test at 100 bar for 30 minutes shows the failure clearly: the extruded lip is chewed back on the low-pressure side. The chart below plots extrusion depth against gland fill; damage rises sharply once fill passes 85 %.<\/p>\n<div class=\"steps\">\n<p class=\"mod-h\">A five-step diagnostic sequence<\/p>\n<ol>\n<li><b>Recover the approved drawing and the change note.<\/b><br \/>Confirm which cross-section was substituted and whether the groove was redrawn at the same time.<\/li>\n<li><b>Recalculate gland fill from measured groove dimensions.<\/b><br \/>Use the actual groove depth and width; a 5.33 mm section in a shallow groove exceeds 100 % fill.<\/li>\n<li><b>Measure diametral clearance at test pressure.<\/b><br \/>Record the gap under 100 bar; a gap above 0.15 mm needs a back-up ring or a harder compound.<\/li>\n<li><b>Inspect the failed seal's low-pressure side.<\/b><br \/>Nibbling or a chewed lip confirms extrusion rather than a simple leak path.<\/li>\n<li><b>Repeat the witnessed test on five assemblies.<\/b><br \/>Hold 100 bar for 30 minutes and measure extrusion depth against the 0.10 mm limit.<\/li>\n<\/ol>\n<\/div>\n<p>The chart below is a typical result from that measurement step. Use it to separate a design limit from a setting that can still be recovered.<\/p>\n<figure>\n<img decoding=\"async\" src=\"https:\/\/uplastech.com\/wp-content\/uploads\/2026\/11\/o-ring-gland-overfill-extrusion-acceptance-chart3.jpg\" alt=\"When a Bigger O-Ring Extrudes: Gland Overfill in a Hydrostatic Test: calculated response trend and an illustrative root-cause split\" width=\"1536\" height=\"909\"><figcaption>Figure 1 \u2014 Calculated response trend and an illustrative root-cause split. Values are engineering guidance for diagnosis, not a measured survey; confirm them on your own line before changing a drawing or a specification.<\/figcaption><\/figure>\n<h2 id=\"read-extrusion-damage-from-a-failed-pressure-test\">Read extrusion damage from a failed pressure test<\/h2>\n<p>Calculate fill from the drawing before any substitution: a 3.53 mm section in a 2.6 mm by 4.8 mm groove sits near 75 %, but a 5.33 mm section in the same groove exceeds 100 %. A section change demands a groove redraw.<\/p>\n<table class=\"spec\">\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Typical target<\/th>\n<th>What goes wrong outside it<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Gland fill<\/td>\n<td>75 - 85 %<\/td>\n<td>Above 90 % rubber extrudes under pressure<\/td>\n<\/tr>\n<tr>\n<td>Diametral clearance at 100 bar<\/td>\n<td>Below 0.15 mm<\/td>\n<td>A 0.25 mm gap lets the lip nibble<\/td>\n<\/tr>\n<tr>\n<td>Hydrostatic acceptance hold<\/td>\n<td>100 bar for 30 min<\/td>\n<td>Shorter tests miss slow extrusion<\/td>\n<\/tr>\n<tr>\n<td>Maximum extrusion depth<\/td>\n<td>0.10 mm<\/td>\n<td>Deeper nibbling fails the witnessed test<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"tablecap\">Table 2 - Gland and acceptance parameters to put on the drawing<\/p>\n<h2 id=\"set-the-gland-and-clearance-limits-on-the-drawing\">Set the gland and clearance limits on the drawing<\/h2>\n<p>Specify gland fill between 75 and 85 %, a diametral clearance below 0.15 mm at 100 bar, and a Shore A 70 compound for the larger gap. Write the 30-minute 100 bar hydrostatic test with a maximum 0.10 mm extrusion limit into the purchase order.<\/p>\n<table>\n<thead>\n<tr>\n<th>Option<\/th>\n<th>When it fits<\/th>\n<th>Trade-off<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Revert to the original cross-section<\/td>\n<td>Substitution caused the failure<\/td>\n<td>Does not address the original weep<\/td>\n<\/tr>\n<tr>\n<td>Fit a PTFE back-up ring<\/td>\n<td>Gap or pressure cannot change<\/td>\n<td>Extra part and assembly step<\/td>\n<\/tr>\n<tr>\n<td>Redraw the groove for the larger section<\/td>\n<td>Higher squeeze genuinely needed<\/td>\n<td>Machining change and new first article<\/td>\n<\/tr>\n<tr>\n<td>Reduce clearance below 0.15 mm<\/td>\n<td>Tooling allows tighter fit<\/td>\n<td>Tighter machining tolerance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"tablecap\">Table 3 - Corrective paths after an overfill extrusion failure<\/p>\n<div class=\"myth\"><b>Myth:<\/b> \"A process adjustment will fix it.\" Once a design limit is reached, more tuning only adds cost and variation. Confirm the limit with a measurement, then change the drawing or the specification.<\/div>\n<h2 id=\"choose-a-back-up-ring-instead-of-more-rubber\">Choose a back-up ring instead of more rubber<\/h2>\n<p>Where pressure or gap cannot be reduced, a PTFE back-up ring closes the extrusion path without adding rubber volume. Fitting one to the low-pressure side of a 90 % fill gland typically cuts extrusion depth from 0.5 mm to under 0.05 mm at 100 bar.<\/p>\n<div class=\"conv\">\n<p class=\"mod-h\">Want a compound check before you re-order?<\/p>\n<p>Send us the gland drawing and the service conditions. We will compare the compound data against your temperature range and return a recommendation with sample parts.<\/p>\n<p class=\"conv-lbl\">What to send us<\/p>\n<ul class=\"conv-need\">\n<li>Gland dimensions and cross-section<\/li>\n<li>Temperature range and media<\/li>\n<li>A failed seal if available<\/li>\n<li>Annual volume<\/li>\n<\/ul>\n<p><a class=\"conv-btn\" href=\"\/silicone-rubber\/\">Send the gland drawing<\/a>\n<\/div>\n<h2 id=\"recovery-actions-ranked-by-line-disruption\">Recovery actions ranked by line disruption<\/h2>\n<p>Recover the held batch by reverting to the original section and adding a back-up ring, then repeat the witnessed 100 bar test on five assemblies. If the drawing cannot be changed, reduce test pressure only with the customer's written agreement and document the extrusion depth.<\/p>\n<div class=\"callout\">Validate one change at a time and keep the measurement record. A supplier discussion backed by data is resolved in days, not weeks.<\/div>\n<div class=\"checklist\">\n<p class=\"mod-h\">Before you release this silicone seal<\/p>\n<ul>\n<li>Gland fill is calculated and stated on the drawing, not assumed from the seal section<\/li>\n<li>Any change of cross-section triggers a groove redraw and a new first article<\/li>\n<li>Diametral clearance is specified at the test pressure, not at room conditions<\/li>\n<li>A 30-minute 100 bar hydrostatic test with a 0.10 mm extrusion limit is in the purchase order<\/li>\n<li>A back-up ring is specified wherever the clearance cannot be closed<\/li>\n<\/ul>\n<p class=\"cl-note\">Most cold or heat failures are specification gaps, not bad batches. Fix the specification before changing suppliers.<\/p>\n<\/div>\n<div class=\"faq\">\n<h3>Why did a bigger O-ring make the leak worse?<\/h3>\n<p>More rubber raised gland fill above 90 %. With no room for expansion, pressure pushed the seal into the clearance gap, where it extruded and nibbled instead of sealing.<\/p>\n<h3>What gland fill should I target?<\/h3>\n<p>Between 75 and 85 % for a static radial seal. That leaves volume for thermal expansion and fluid swell while keeping enough squeeze to seal.<\/p>\n<h3>Can a harder compound stop extrusion?<\/h3>\n<p>It helps: a Shore A 70 compound resists the gap better than a 40 or 50 grade. But hardness cannot fix a 0.25 mm clearance at 100 bar; a back-up ring or tighter machining is needed.<\/p>\n<h3>What does extrusion damage look like?<\/h3>\n<p>The low-pressure side of the seal is chewed back, with small crescent-shaped bites of rubber missing. It is distinct from a clean cut or a compression split.<\/p>\n<h3>Is a back-up ring better than redrawing the groove?<\/h3>\n<p>A PTFE back-up ring is quicker and keeps the existing tool, often cutting extrusion depth from 0.5 mm to under 0.05 mm. A redraw gives a cleaner long-term design.<\/p>\n<h3>Should we lower the acceptance pressure?<\/h3>\n<p>Only with the customer's written agreement. The test exists to reproduce service pressure; lowering it hides the overfill rather than fixing the gland.<\/p>\n<\/div>\n<div class=\"cta\">\n<p class=\"cta-h\">Get a seal specified for the real service conditions<\/p>\n<p>Send us the gland drawing and the service conditions. We will recommend a compound with documented test data, review the squeeze, and supply samples with a production quotation.<\/p>\n<p class=\"cta-lbl\">To get an accurate quote, send:<\/p>\n<ul class=\"cta-need\">\n<li>Gland drawing or seal cross-section<\/li>\n<li>Temperature range and media<\/li>\n<li>Pressure and movement<\/li>\n<li>Annual volume and target unit price<\/li>\n<\/ul>\n<p><a class=\"btn\" href=\"\/silicone-rubber\/\">Request samples and a quotation<\/a><br \/>\n<!-- upl-conv-v1 contact --><\/p>\n<div class=\"contactbar\">\n<p class=\"contactbar-h\">Prefer to talk it through first?<\/p>\n<p>Email <a href=\"mailto:john@uplastech.com\">john@uplastech.com<\/a> or message us on <a href=\"https:\/\/wa.me\/8617717529949\">WhatsApp +86 177 1752 9949<\/a>. Send a drawing, a sample or a specification and an engineer will reply.<\/p>\n<\/div>\n<p><!-- upl-conv-v1 trust --><\/p>\n<div class=\"trust\">\n<p class=\"trust-h\">Why buyers work with Uplastech<\/p>\n<p>ISO 9001, ISO 14001 and ISO 45001 certified. Founded in 2016, with injection moulding lines in Shanghai and an extrusion plant in Jiangsu. Moulding machines from 90T to 1100T and a maximum shot weight of 5100 g. Samples and a written quotation are available on request.<\/p>\n<\/div>\n<\/div>\n<div class=\"rel\">\n<h4>Continue reading<\/h4>\n<ul>\n<li><a href=\"https:\/\/uplastech.com\/silicone-compression-set\/\">Silicone compression set<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/silicone-gasket-seal\/\">Silicone gasket and seal design<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/silicone-hardness-shore-a\/\">Silicone hardness: Shore A<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/silicone-industrial-seals\/\">Silicone industrial seals<\/a><\/li>\n<li><a href=\"https:\/\/uplastech.com\/silicone-o-ring-manufacturing\/\">Silicone o-ring manufacturing<\/a><\/li>\n<\/ul>\n<p><!-- upl-conv-v1 service --><\/p>\n<p class=\"rel-svc\">Ready to specify? See our <a href=\"https:\/\/uplastech.com\/silicone-rubber\/\">silicone rubber moulding services<\/a> or <a href=\"mailto:john@uplastech.com\">request a written quotation<\/a>.<\/p>\n<\/div>\n<\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Why did a bigger O-ring make the leak worse?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"More rubber raised gland fill above 90 %. With no room for expansion, pressure pushed the seal into the clearance gap, where it extruded and nibbled instead of sealing.\"}}, {\"@type\": \"Question\", \"name\": \"What gland fill should I target?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Between 75 and 85 % for a static radial seal. That leaves volume for thermal expansion and fluid swell while keeping enough squeeze to seal.\"}}, {\"@type\": \"Question\", \"name\": \"Can a harder compound stop extrusion?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It helps: a Shore A 70 compound resists the gap better than a 40 or 50 grade. But hardness cannot fix a 0.25 mm clearance at 100 bar; a back-up ring or tighter machining is needed.\"}}, {\"@type\": \"Question\", \"name\": \"What does extrusion damage look like?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The low-pressure side of the seal is chewed back, with small crescent-shaped bites of rubber missing. It is distinct from a clean cut or a compression split.\"}}, {\"@type\": \"Question\", \"name\": \"Is a back-up ring better than redrawing the groove?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A PTFE back-up ring is quicker and keeps the existing tool, often cutting extrusion depth from 0.5 mm to under 0.05 mm. A redraw gives a cleaner long-term design.\"}}, {\"@type\": \"Question\", \"name\": \"Should we lower the acceptance pressure?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Only with the customer's written agreement. The test exists to reproduce service pressure; lowering it hides the overfill rather than fixing the gland.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This guide calculates gland fill, links overfill to extrusion through the clearance gap, and gives a gland and acceptance-test clause to put on the drawing.<\/p>","protected":false},"author":1,"featured_media":7405,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[],"class_list":["post-9157","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-silicone-rubber-products"],"meta_box":{"post-to-quiz_to":[]},"_links":{"self":[{"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/posts\/9157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/comments?post=9157"}],"version-history":[{"count":1,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/posts\/9157\/revisions"}],"predecessor-version":[{"id":9259,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/posts\/9157\/revisions\/9259"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/media\/7405"}],"wp:attachment":[{"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/media?parent=9157"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/categories?post=9157"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uplastech.com\/de\/wp-json\/wp\/v2\/tags?post=9157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}